Pascoe Vale Hotel

Pascoe Vale Hotel

Works incorporated the refurbishment of the gaming room and bistro, an extension of the building that included a new TAB, public bar and extension to the public bar toilets. The demolition of the existing drive through bottle shop / cool room allowed for the creation a new outdoor area featuring bench seating, heating and a large screen T.V and the installation of two Vergola's.  The venue remained operational throughout the building works.  Duration of approx. 5 months.
Budget range: up to $1.5 Mil

Commercial interior designs